Thursday, May 17, 2012

Repairs to Ohio River Lock Delayed from the Pittsburgh Post-Gazette 
"Critical repairs to an unstable Ohio River lock have been postponed indefinitely because Crescent Township and the U.S. Army Corps of Engineers cannot agree on a plan to fix a damaged road that is preventing construction trucks from reaching the lock."

No comments:

Post a Comment